Grupo12Aérea

Airbus Mobile assembly line taking shape

With the placement of the final truss atop the roof week, the construction of the first building in the Airbus Mobile Assembly Line complex in Alabama has reached an important milestone. The entire metal skeleton of the building can now be seen. This building is the Final Assembly Line Hangar, which is where A320 family aircraft will be assembled. The milestone was celebrated with the construction crew and project team members signing the final truss before it was lifted into position.
 
Construction contracts for the other buildings in the complex will be awarded soon. Aircraft assembly is scheduled to begin in 2015, with first deliveries from the Mobile, Ala., facility beginning in 2016. Airbus anticipates the facility will produce between 40 and 50 aircraft per year by 2018.
 

As informações são"http://www.onlineamd.com/airbus-mobile-alabama-assembly-line-building-012514.aspx".Sempre é citado o link de referência.

Grupo12Aérea

About Grupo12Aérea -

Author Description here.. Nulla sagittis convallis. Curabitur consequat. Quisque metus enim, venenatis fermentum, mollis in, porta et, nibh. Duis vulputate elit in elit. Mauris dictum libero id justo.

Subscribe to this Blog via Email :
© Copyright 2017 12Aérea News. Designed by HTML5 | Distributed By . G12horas.Aerea.